Gate Bridge

Finishing the bridge / gate

I have recently gotten active in trying to finish the gate-bridge at the open end of the layout. I had to learn how to cut and shape foam and how to secure ballast on the sides of the fill area on both sides of the bridge. This involved watching a lot of YouTube and Model Railroad Video Plus documents. After a lot of introspection I think I am ready.

It's only fair to share...Share on email
Email
Share on facebook
Facebook
0
Share on google
Google
Share on twitter
Twitter
Share on linkedin
Linkedin
0

Cataloging my Rolling Stock

As a diversion while the paint dries on the new gate at the entrance to the layout, I decided it was time to catalog my storage boxes of acquired rolling stock. This does not include all my engines or passenger cars. I’m finding the process very educational as I did not realize how many duplicates or modern cars I had acquired in the last few years. Since my Pacific Cascade Railway operates in pre-BN merger 1969/1970, anything newer than March 1970 has to go. This includes several newer, beautiful cars I mistakenly acquired. I have two more totes like the one on the left to go. I will have enough car kits to keep me busy for years to come.

It's only fair to share...Share on email
Email
Share on facebook
Facebook
0
Share on google
Google
Share on twitter
Twitter
Share on linkedin
Linkedin
0